A FORTS PLANNING GUIDE

Temporary Fire Stations During Reconstruction

A temporary fire station needs to support the whole shift while a permanent station is being rebuilt, renovated or relocated. FORTS configurations can bring crew sleeping rooms, shared living areas and work spaces together in a connected temporary facility.

FORTS fire-station bedroom with a bed, bedside table and personal locker
An actual sleeping room in a manufacturer-documented FORTS fire-station configuration.
01

Use the on-duty crew and daily routine to shape the rooms.

02

Coordinate the living facility with apparatus access and parking.

03

Define utility connections and support responsibilities early.

Build Around the Shift

Start with the people assigned to the station at one time, including any overlap during shift changes. List the activities that need their own rooms: sleeping, reporting, meals, shared downtime and any supervisory work. Then map the routes between those spaces and the apparatus area.

FORTS offers connected, climate-controlled room configurations that can bring these daily functions together. More private sleeping rooms and shared living spaces serve different needs, so choose the arrangement around the department’s routine rather than dividing the footprint into equal rooms.

Put the Main Functions on One Plan

Use a room schedule to make the facility brief concrete. Note where an existing site building or another supplier will provide a function so it can be coordinated with the FORTS scope.

Put the Main Functions on One Plan: planning details
AreaQuestions for the department
Crew quartersHow many on-duty personnel? What sleeping privacy and personal storage are needed?
Day room & mealsHow will the crew cook, dine and spend shared time?
Reporting & supervisionWhich work positions, network connections and separate rooms are needed?
Bathrooms & laundryWhich fixtures and connections are required? Is laundry part of the project?

Connect the Facility to the Site

The crew accommodation plan needs to fit the wider station operation. Identify apparatus parking, vehicle movements, pedestrian routes, equipment storage and any separate support facilities. An accommodation layout does not itself define an apparatus bay or the full station site.

Review delivery access, placement, leveling, anchoring and entry routes alongside power, communications, water and wastewater connections. Plan the move with the department’s construction schedule: assembling the structure and making the complete station ready for the crew are separate milestones.

Prepare the Department’s Brief

The published FORTS crew layouts are useful starting points for discussing room relationships. Bring the site conditions and daily routine into the review before selecting a configuration. Include anticipated construction delays when discussing rental duration and extension options.

  • On-duty crew count, sleeping-room preferences and shift overlap.
  • Required living, kitchen, bathroom, laundry and reporting functions.
  • Site plan or photographs showing apparatus areas and available utilities.
  • Move-in date, expected rental term and installation or maintenance responsibilities.
YOUR NEXT STEP

Tell Us What Needs to Keep Moving.

Share your location, dates and the people or functions you need to accommodate.

Plan a Temporary Fire Station
PRACTICAL ANSWERS

Common Questions

Are there sample layouts for different crew sizes?

Yes. The website includes manufacturer sample layouts for four-, six- and eight-person crews across multiple connected units. They illustrate complete facility arrangements; they are not occupancy counts for a single unit or a promise of current availability.

Are kitchens, bathrooms and laundry included?

The selected layout and rental proposal define the supplied components and furnishings. Bathroom and kitchen connections require site coordination; laundry is an optional item to discuss. Identify who will provide each utility and service in the project scope.

Can the station remain in use throughout a long reconstruction project?

The rental can be planned around the expected reconstruction term. Confirm the operating requirements, maintenance arrangements, available inventory and extension terms before the department moves into the temporary facility.