FORTS IN THE FIELD

VA Mobile Healthcare: Space and Support Planned Together

At Orlando VA Medical Center in 2020, a FORTS medical system was evaluated as a proof of concept for healthcare capacity that could move. The manufacturer’s customer interview offers a useful starting point for planning temporary clinical space.

Connected FORTS medical shelters and supporting equipment beside Lake Nona VA Medical Center
Actual VA medical facilities beside Lake Nona VA Medical Center. Manufacturer photograph.
01

Start with the clinical functions and the people using each room.

02

Develop the room arrangement alongside equipment and utility needs.

03

Include the operating team before finalizing the facility scope.

A Medical Facility Designed to Move

The manufacturer’s 2020 customer interview describes a system that could operate together or in smaller arrangements. It also explains how clinical and technical staff walked through the proposed facility to review their needs and become familiar with the space.

The discussion includes water, electrical service, backup generation and clinical equipment. These are parts of the overall facility requirement, alongside the shelter layout. The example demonstrates a planning approach; it does not define one standard medical rental package.

Planning Takeaway: Define the Care Path

For a healthcare continuity project, begin with the service that needs temporary space. An examination room, treatment area, staff workspace and equipment room each create a different brief. Identify the rooms that need to be adjacent and the routes used by patients, staff and supplies.

Use that brief to review furniture, equipment positions, access and service connections with the facility team. A photograph can help communicate the desired environment; a project-specific plan establishes what will actually be provided.

Bring These Details to Your Rental Plan

A useful first discussion brings the clinical lead, facilities team and rental provider around the same requirements. Define the building scope and the equipment and services supplied by others, then agree the sequence for installation and opening.

  • The functions being relocated, expected users and required room relationships.
  • Equipment dimensions, power demand, water and wastewater needs, and data connections.
  • Site access, rental period, target opening date and responsibility for operational readiness.

Project Documentation

Documented by FORTS / Elite Aluminum Corporation. This manufacturer example illustrates the shelter platform and facility planning; it is not presented as a FORTS Services rental contract.

VA mobile healthcare customer story and interview (opens in a new tab)
YOUR NEXT STEP

Tell Us What Needs to Keep Moving.

Share your location, dates and the people or functions you need to accommodate.

Plan Temporary Healthcare Space